Cart
Home/SWMS Packs/Steel Fixing & Structural Steel

ST · SWMS Pack

Steel Fixing & Structural Steel SWMS Pack

Safe Work Method Statement templates for steel fixing and structural steel: reinforcing placement and tying, prefabrication and handling, structural steel erection, bolting and welding, crane and lifting operations, work at height, plus the Master Safe Work Method Statement for the general activities in its scope.

What is in the pack

Every document listed below, as editable Word files, headed Safe Work Method Statement. Task Analyses are sold separately, at the same price. Each one is a starting point: you review it against the actual job, delete what is not there, add what is, fill the site fields and brief the crew before it is used.

New to the paperwork for this trade? The hazards that matter for Steel Fixing & Structural Steel, and what a main contractor will ask for.

SWMS-ST-01 · covers the general activities within its stated scope
Master

Every document in Steel Fixing & Structural Steel

Before you buy

These are templates, not a finished safety system, and they require site-specific completion. They are written to the Health and Safety at Work Act 2015 and the General Risk and Workplace Management Regulations 2016. New Zealand does not require a document of this name by law; your main contractor asks for one to evidence the risk-management duty under HSWA s36, and support the worker engagement and participation duties under ss58 to 59.Licence terms · Refund policy