Telehandler Task Analysis

Operating a telescopic handler to lift, move and place loads and to work with attachments (forks, jib, work platform) on construction and civil sites.

What you get

One editable Word document covering telehandler for Steel Fixing & Structural Steel: the task broken into steps, the hazards at each step, the controls, and a 5 by 5 risk matrix with residual ratings. Site fields and a crew sign-on are built in.

A Task Analysis is also known as a JSA (Job Safety Analysis) or JSEA. It covers each step of the job, the hazards and the controls.

The steps and hazards it covers

StepHazards
Pre-operational checks and competencyUntrained or unauthorised operatorDefective machine, tyres, forks or attachments failing in use
Site and ground assessmentOverturn on soft, uneven or sloping ground or near excavationsContact with overhead powerlines
Lifting and load managementOverloading or working outside the load chart - tip-over or dropped loadLoad falling from forks or attachment
Travelling and people nearbyStriking pedestrians or workers in the operating zoneReduced visibility and blind spots
Work platforms and attachmentsUsing a non-approved attachment or unapproved man-cage - fall or crush
Park and shut downMachine left unsecured or attachment raised

Each hazard comes with its control measures, an initial and residual risk rating and the person responsible, ready to check against your job.

How to use it

Read it against the actual job. Delete the hazards that are not there, add the ones that are, fill the site fields, then brief the crew and get every name on the sign-on. A document nobody has read is a piece of paper. One the crew helped finish supports worker consultation and records the agreed work method. Engagement under HSWA ss58 to 59 is an ongoing process of seeking and considering workers’ views, so the signed page is evidence of part of it rather than the whole duty.

About Steel Fixing & Structural Steel Task Analysis

This is one of the Task Analysis documents written for Steel Fixing & Structural Steel crews. The trade covers reinforcing placement and tying, structural steel erection, bolting and welding, crane lifts, work at height.

See every Steel Fixing & Structural Steel document, or the whole pack for $199.99. Need 5 or more templates from this trade? The pack costs less than buying them individually, and saves $49.96 at 5.

Where it sits in the law

New Zealand does not require a document of this name. The duty is to manage risk so far as is reasonably practicable (HSWA s36) and to engage workers on it (ss58 to 59). Use a Task Analysis to plan the work, identify the hazards and communicate the controls to your crew. That is also how you evidence both duties.

WorkSafe names “a task analysis, safe work method statement (SWMS), job safety analysis or equivalent planning document” as the same thing done under different headings, and Site Safe titles one of its own SSSP forms “Task Analysis (TA) and Safe Work Method Statement (SWMS)”. So if the paperwork you have been sent asks for a TA, a SWMS or a JSA, this is the document it means, written to the Health and Safety at Work Act 2015. Only the name changes; the hazards, controls and ratings are the same either way.

Where this sits in your SSSP

A Site-Specific Safety Plan (SSSP) covers the whole job: who is on site, how hazards get reported, what happens in an emergency. A Task Analysis covers one task inside it. They are not the same document. Site Safe’s SSSP pack runs to ten forms, and the Task Analysis is Form 10, filed behind the plan itself.

So a main contractor who asks which SSSP pack you are using, and then asks for a TA covering telehandler, has asked you for two separate things. This is the second one. Keep it with your SSSP for the job and bring it to the pre-start briefing, because the value is in the crew having read it before the work starts.

Same task, other trades

This task exists in other trades too, and each edition is written for that crew. Compare all 3, or go straight to Civil & Earthworks, Residential Building & Carpentry.