TA-TL-01 · Tiling & Waterproofing
Tiling and Waterproofing - Master Task Analysis
All tiling and waterproofing works including substrate preparation, screeding, wet area and external waterproofing, and wall and floor tiling where a task-specific TA is not required.
What you get
One editable Word document covering tiling and waterproofing - master task analysis for Tiling & Waterproofing: the task broken into steps, the hazards at each step, the controls, and a 5 by 5 risk matrix with residual ratings. Site fields and a crew sign-on are built in.
A Task Analysis is also known as a JSA (Job Safety Analysis) or JSEA. It covers each step of the job, the hazards and the controls.
The steps and hazards it covers
| Step | Hazards |
|---|---|
| Plan, prepare and confirm competency | Workers without the required training, competence or authorisation performing the task - incidents arising from lack of skill, competency or authorityDefective or unsafe plant, powered equipment, leads or attachments failing in useWorking on other people's sites, occupied premises or around the public |
| Assess substrates and set up the work area | Unknown substrates - pre-2000 sheet flooring, vinyl, adhesives or backing presumed to contain asbestosSlips, trips and uncontrolled access during set-up |
| Prepare and grind substrates | Respirable crystalline silica from grinding concrete and old beds - silicosisNoise from grinders and power tools - hearing damage |
| Mix and place screeds, adhesives and grouts | Wet cement and screed - alkaline burns and dermatitisCement and mixing dust - respiratory irritation and silicaEpoxy grouts and adhesives - skin sensitisation and irritation |
| Apply waterproofing membranes in wet areas | Solvent and PU/epoxy membrane vapour build-up in small, poorly ventilated wet areas - intoxication and ignition |
| Carry out external, balcony and podium waterproofing | Falls from unprotected balcony, podium or roof edges - serious injury or death |
| Cut and lay tiles | Respirable crystalline silica from cutting porcelain, stone and tiles - silicosisElectric shock using power tools near water in wet areas - electrocutionSustained kneeling and manual handling of tiles and stone - cumulative knee and back injury |
| Flood test, clean up and hand over | Flood test water and wet floors - slips and water damage belowSlurry, solvent rags and waste - environmental harm and fire |
Each hazard comes with its control measures, an initial and residual risk rating and the person responsible, ready to check against your job.
Preview the first 6 pagesSee the layout, the work screening table and the sign-on block






Preview pages are watermarked. The highlighted fields are the ones you complete for your site. This is the Tiling & Waterproofing Master; the task documents in the pack follow the same structure.
How to use it
Read it against the actual job. Delete the hazards that are not there, add the ones that are, fill the site fields, then brief the crew and get every name on the sign-on. A document nobody has read is a piece of paper. One the crew helped finish supports worker consultation and records the agreed work method. Engagement under HSWA ss58 to 59 is an ongoing process of seeking and considering workers’ views, so the signed page is evidence of part of it rather than the whole duty.
About Tiling & Waterproofing Task Analysis
This is the Master for Tiling & Waterproofing, covering the general activities within its stated scope. The trade covers wet area and external waterproofing, screeding, wall and floor tiling, cutting and grinding, silica dust.
See every Tiling & Waterproofing document, or the whole pack for $199.99. Need 5 or more templates from this trade? The pack costs less than buying them individually, and saves $49.96 at 5.
Where it sits in the law
New Zealand does not require a document of this name. The duty is to manage risk so far as is reasonably practicable (HSWA s36) and to engage workers on it (ss58 to 59). Use a Task Analysis to plan the work, identify the hazards and communicate the controls to your crew. That is also how you evidence both duties.
WorkSafe names “a task analysis, safe work method statement (SWMS), job safety analysis or equivalent planning document” as the same thing done under different headings, and Site Safe titles one of its own SSSP forms “Task Analysis (TA) and Safe Work Method Statement (SWMS)”. So if the paperwork you have been sent asks for a TA, a SWMS or a JSA, this is the document it means, written to the Health and Safety at Work Act 2015. Only the name changes; the hazards, controls and ratings are the same either way.
Where this sits in your SSSP
A Site-Specific Safety Plan (SSSP) covers the whole job: who is on site, how hazards get reported, what happens in an emergency. A Task Analysis covers one task inside it. They are not the same document. Site Safe’s SSSP pack runs to ten forms, and the Task Analysis is Form 10, filed behind the plan itself.
So a main contractor who asks which SSSP pack you are using, and then asks for a TA covering tiling and waterproofing - master task analysis, has asked you for two separate things. This is the second one. Keep it with your SSSP for the job and bring it to the pre-start briefing, because the value is in the crew having read it before the work starts.