TA-FL-14 · Flooring
Raised Timber Floors Task Analysis
Construction of raised timber floor systems over a subfloor including bearers, joists and structural flooring sheets, with subfloor preparation and access work.
What you get
One editable Word document covering raised timber floors for Flooring: the task broken into steps, the hazards at each step, the controls, and a 5 by 5 risk matrix with residual ratings. Site fields and a crew sign-on are built in.
A Task Analysis is also known as a JSA (Job Safety Analysis) or JSEA. It covers each step of the job, the hazards and the controls.
The steps and hazards it covers
| Step | Hazards |
|---|---|
| Plan, prepare and confirm competency | Workers without the required training, competence or authorisation performing the task - incidents arising from lack of skill, competency or authorityDefective or unsafe plant, powered equipment, leads or attachments failing in useWorking on other people's sites, occupied premises or around the public |
| Prepare the subfloor and install bearers | Strain and restricted subfloor work installing bearers; services below |
| Work on the open joist layout | Falls through the joist layout - ankle and impalement injuriesFalls from the perimeter of the raised floor |
| Lay and fix flooring sheets | Strain handling sheet flooring; sheets tipping on edgesPuncture wounds and adhesive exposure from nail guns and gluing |
| Cut sheets and joists with power saws | Lacerations cutting sheets and joists in placeRespiratory exposure cutting treated or hardwood timber |
| Enter the subfloor later | Confined and restricted subfloor space, vermin and services below the floor |
| Complete and demobilise | Voids and penetrations left open through the new floor |
Each hazard comes with its control measures, an initial and residual risk rating and the person responsible, ready to check against your job.
How to use it
Read it against the actual job. Delete the hazards that are not there, add the ones that are, fill the site fields, then brief the crew and get every name on the sign-on. A document nobody has read is a piece of paper. One the crew helped finish supports worker consultation and records the agreed work method. Engagement under HSWA ss58 to 59 is an ongoing process of seeking and considering workers’ views, so the signed page is evidence of part of it rather than the whole duty.
About Flooring Task Analysis
This is one of the Task Analysis documents written for Flooring crews. The trade covers floor covering removal, screeding and levelling, grinding and polishing, resilient and timber overlay, adhesives.
See every Flooring document, or the whole pack for $199.99. Need 5 or more templates from this trade? The pack costs less than buying them individually, and saves $49.96 at 5.
Where it sits in the law
New Zealand does not require a document of this name. The duty is to manage risk so far as is reasonably practicable (HSWA s36) and to engage workers on it (ss58 to 59). Use a Task Analysis to plan the work, identify the hazards and communicate the controls to your crew. That is also how you evidence both duties.
WorkSafe names “a task analysis, safe work method statement (SWMS), job safety analysis or equivalent planning document” as the same thing done under different headings, and Site Safe titles one of its own SSSP forms “Task Analysis (TA) and Safe Work Method Statement (SWMS)”. So if the paperwork you have been sent asks for a TA, a SWMS or a JSA, this is the document it means, written to the Health and Safety at Work Act 2015. Only the name changes; the hazards, controls and ratings are the same either way.
Where this sits in your SSSP
A Site-Specific Safety Plan (SSSP) covers the whole job: who is on site, how hazards get reported, what happens in an emergency. A Task Analysis covers one task inside it. They are not the same document. Site Safe’s SSSP pack runs to ten forms, and the Task Analysis is Form 10, filed behind the plan itself.
So a main contractor who asks which SSSP pack you are using, and then asks for a TA covering raised timber floors, has asked you for two separate things. This is the second one. Keep it with your SSSP for the job and bring it to the pre-start briefing, because the value is in the crew having read it before the work starts.
Same task, other trades
This task exists in other trades too, and each edition is written for that crew. Compare all 2, or go straight to Residential Building & Carpentry.