Cart
Home/Task Analysis/Fencing/Workshop Machinery Operation

TA-FN-13 · Fencing

Workshop Machinery Operation Task Analysis

Operation of fabrication workshop machinery including lathes, mills, pedestal drills, cold saws, press brakes, benders, guillotines and ironworkers, with guarding, isolation and maintenance interfaces.

What you get

One editable Word document covering workshop machinery operation for Fencing: the task broken into steps, the hazards at each step, the controls, and a 5 by 5 risk matrix with residual ratings. Site fields and a crew sign-on are built in.

A Task Analysis is also known as a JSA (Job Safety Analysis) or JSEA. It covers each step of the job, the hazards and the controls.

The steps and hazards it covers

StepHazards
Plan, prepare and confirm competencyWorkers without the required training, competence or authorisation performing the task - incidents arising from lack of skill, competency or authorityDefective or unsafe plant, powered equipment, leads or attachments failing in useWorking on other people's sites, occupied premises or around the public
Authorise operators & check guardingUntrained operators at dangerous machines causing serious injuryAmputation at the point of operation from missing or bypassed guards
Lathe, mill & drilling operationsEntanglement of gloves, sleeves and hair in rotating spindles and chucks
Guillotine & ironworker operationsFingers under the blade, hold-downs or punch causing amputation or crush
Press brake & bender operationsCrush between punch and die and whip-up of the workpiece
Cold saws & cutting machinesContact with the blade and ejection of offcuts causing cutsNoise around presses, saws and machinery causing hearing damage
Clear jams & maintain machinesMachine cycling during jam clearing or service causing amputation or crush
Clean up & demobiliseSwarf, offcuts, oil and leads around machinery causing cuts and slips

Each hazard comes with its control measures, an initial and residual risk rating and the person responsible, ready to check against your job.

How to use it

Read it against the actual job. Delete the hazards that are not there, add the ones that are, fill the site fields, then brief the crew and get every name on the sign-on. A document nobody has read is a piece of paper. One the crew helped finish supports worker consultation and records the agreed work method. Engagement under HSWA ss58 to 59 is an ongoing process of seeking and considering workers’ views, so the signed page is evidence of part of it rather than the whole duty.

About Fencing Task Analysis

This is one of the Task Analysis documents written for Fencing crews. The trade covers post hole boring and services, timber, mesh and pool fencing, gates and hardware, work on boundaries and berms.

See every Fencing document, or the whole pack for $199.99. Need 5 or more templates from this trade? The pack costs less than buying them individually, and saves $49.96 at 5.

Where it sits in the law

New Zealand does not require a document of this name. The duty is to manage risk so far as is reasonably practicable (HSWA s36) and to engage workers on it (ss58 to 59). Use a Task Analysis to plan the work, identify the hazards and communicate the controls to your crew. That is also how you evidence both duties.

WorkSafe names “a task analysis, safe work method statement (SWMS), job safety analysis or equivalent planning document” as the same thing done under different headings, and Site Safe titles one of its own SSSP forms “Task Analysis (TA) and Safe Work Method Statement (SWMS)”. So if the paperwork you have been sent asks for a TA, a SWMS or a JSA, this is the document it means, written to the Health and Safety at Work Act 2015. Only the name changes; the hazards, controls and ratings are the same either way.

Where this sits in your SSSP

A Site-Specific Safety Plan (SSSP) covers the whole job: who is on site, how hazards get reported, what happens in an emergency. A Task Analysis covers one task inside it. They are not the same document. Site Safe’s SSSP pack runs to ten forms, and the Task Analysis is Form 10, filed behind the plan itself.

So a main contractor who asks which SSSP pack you are using, and then asks for a TA covering workshop machinery operation, has asked you for two separate things. This is the second one. Keep it with your SSSP for the job and bring it to the pre-start briefing, because the value is in the crew having read it before the work starts.