TA-DM-06 · Demolition & Strip-out
Soft Demolition - Strip-Out Task Analysis
Internal non-structural strip-out of fit-out, linings, ceilings, services and fixtures without disturbing structural elements.
What you get
One editable Word document covering soft demolition - strip-out for Demolition & Strip-out: the task broken into steps, the hazards at each step, the controls, and a 5 by 5 risk matrix with residual ratings. Site fields and a crew sign-on are built in.
A Task Analysis is also known as a JSA (Job Safety Analysis) or JSEA. It covers each step of the job, the hazards and the controls.
The steps and hazards it covers
| Step | Hazards |
|---|---|
| Plan, prepare and confirm competency | Workers without the required training, competence or authorisation performing the task - incidents arising from lack of skill, competency or authorityDefective or unsafe plant, powered equipment, leads or attachments failing in useWorking on other people's sites, occupied premises or around the public |
| Confirm scope and protect structure | Cutting or removing a structural element during strip-out - collapse |
| Asbestos and hazardous materials check | Disturbing asbestos in walls, ceilings, vinyl, glues, lagging or SMF without knowing |
| Isolate and prove services dead | Electric shock from concealed live wiring; water or gas release |
| Remove ceilings and linings | Falling sheets, frames and stored debris from above; falls from height stripping ceilingsRespirable dust from ceiling tiles, plaster and insulation |
| Remove fixtures, partitions and joinery | Falling partitions; cuts and puncture wounds from sharps; strain |
| Work at height on ladders and platforms | Falls during overhead strip-out |
| Waste handling and removal | Strain, cuts and trips from debris in access ways |
| Manage dust and noise in occupied buildings | Exposure of building occupants; complaints |
| Clean up, complete and hand over | Live services or sharp hazards left exposed |
Each hazard comes with its control measures, an initial and residual risk rating and the person responsible, ready to check against your job.
How to use it
Read it against the actual job. Delete the hazards that are not there, add the ones that are, fill the site fields, then brief the crew and get every name on the sign-on. A document nobody has read is a piece of paper. One the crew helped finish supports worker consultation and records the agreed work method. Engagement under HSWA ss58 to 59 is an ongoing process of seeking and considering workers’ views, so the signed page is evidence of part of it rather than the whole duty.
About Demolition & Strip-out Task Analysis
This is one of the Task Analysis documents written for Demolition & Strip-out crews. The trade covers soft strip and structural demolition, asbestos and lead, services isolation, exclusion zones, loadout.
See every Demolition & Strip-out document, or the whole pack for $199.99. Need 5 or more templates from this trade? The pack costs less than buying them individually, and saves $49.96 at 5.
Where it sits in the law
New Zealand does not require a document of this name. The duty is to manage risk so far as is reasonably practicable (HSWA s36) and to engage workers on it (ss58 to 59). Use a Task Analysis to plan the work, identify the hazards and communicate the controls to your crew. That is also how you evidence both duties.
WorkSafe names “a task analysis, safe work method statement (SWMS), job safety analysis or equivalent planning document” as the same thing done under different headings, and Site Safe titles one of its own SSSP forms “Task Analysis (TA) and Safe Work Method Statement (SWMS)”. So if the paperwork you have been sent asks for a TA, a SWMS or a JSA, this is the document it means, written to the Health and Safety at Work Act 2015. Only the name changes; the hazards, controls and ratings are the same either way.
Where this sits in your SSSP
A Site-Specific Safety Plan (SSSP) covers the whole job: who is on site, how hazards get reported, what happens in an emergency. A Task Analysis covers one task inside it. They are not the same document. Site Safe’s SSSP pack runs to ten forms, and the Task Analysis is Form 10, filed behind the plan itself.
So a main contractor who asks which SSSP pack you are using, and then asks for a TA covering soft demolition - strip-out, has asked you for two separate things. This is the second one. Keep it with your SSSP for the job and bring it to the pre-start briefing, because the value is in the crew having read it before the work starts.
Same task, other trades
This task exists in other trades too, and each edition is written for that crew. Compare all 2, or go straight to Residential Building & Carpentry.