Site Establishment and Setout Task Analysis

Establishing the work site before demolition - access, amenities and laydown, perimeter fencing and hoarding, traffic and pedestrian management, locating services, temporary power and water, and setting out the works.

What you get

One editable Word document covering site establishment and setout for Demolition & Strip-out: the task broken into steps, the hazards at each step, the controls, and a 5 by 5 risk matrix with residual ratings. Site fields and a crew sign-on are built in.

A Task Analysis is also known as a JSA (Job Safety Analysis) or JSEA. It covers each step of the job, the hazards and the controls.

The steps and hazards it covers

StepHazards
Plan, prepare and confirm competencyWorkers without the required training, competence or authorisation performing the task - incidents arising from lack of skill, competency or authorityDefective or unsafe plant, powered equipment, leads or attachments failing in useWorking on other people's sites, occupied premises or around the public
Plan the site layout and induct workersSiting facilities over services or in flood and traffic paths; workers unaware of site hazards
Locate and mark servicesStriking buried electrical, gas, water, comms or sewer services during set-outContact with overhead powerlines positioning plant, cranes or structures
Erect fencing, hoarding and set up traffic controlPublic entering an unsecured site; hoarding falling onto footpathsWorkers and public struck by passing traffic where the site adjoins a roadWorkers struck-by delivery vehicles and mobile plant during the busy establishment phase
Crane and deliver site sheds, containers and amenitiesCrush from craned site sheds and containers
Connect temporary power and waterElectrocution from an unsuitable temporary electrical supplyServices strikes or cross-connection contamination connecting water and sewer
Install fencing posts, signage and set out the worksManual handling and post-driving injuries; striking services driving posts
Establish environmental controls and emergency preparednessSediment, dust and noise affecting neighbours and stormwaterInadequate emergency response, first aid or evacuation at start of works
Complete establishment and secure the siteUnsecured site at first night

Each hazard comes with its control measures, an initial and residual risk rating and the person responsible, ready to check against your job.

How to use it

Read it against the actual job. Delete the hazards that are not there, add the ones that are, fill the site fields, then brief the crew and get every name on the sign-on. A document nobody has read is a piece of paper. One the crew helped finish supports worker consultation and records the agreed work method. Engagement under HSWA ss58 to 59 is an ongoing process of seeking and considering workers’ views, so the signed page is evidence of part of it rather than the whole duty.

About Demolition & Strip-out Task Analysis

This is one of the Task Analysis documents written for Demolition & Strip-out crews. The trade covers soft strip and structural demolition, asbestos and lead, services isolation, exclusion zones, loadout.

See every Demolition & Strip-out document, or the whole pack for $199.99. Need 5 or more templates from this trade? The pack costs less than buying them individually, and saves $49.96 at 5.

Where it sits in the law

New Zealand does not require a document of this name. The duty is to manage risk so far as is reasonably practicable (HSWA s36) and to engage workers on it (ss58 to 59). Use a Task Analysis to plan the work, identify the hazards and communicate the controls to your crew. That is also how you evidence both duties.

WorkSafe names “a task analysis, safe work method statement (SWMS), job safety analysis or equivalent planning document” as the same thing done under different headings, and Site Safe titles one of its own SSSP forms “Task Analysis (TA) and Safe Work Method Statement (SWMS)”. So if the paperwork you have been sent asks for a TA, a SWMS or a JSA, this is the document it means, written to the Health and Safety at Work Act 2015. Only the name changes; the hazards, controls and ratings are the same either way.

Where this sits in your SSSP

A Site-Specific Safety Plan (SSSP) covers the whole job: who is on site, how hazards get reported, what happens in an emergency. A Task Analysis covers one task inside it. They are not the same document. Site Safe’s SSSP pack runs to ten forms, and the Task Analysis is Form 10, filed behind the plan itself.

So a main contractor who asks which SSSP pack you are using, and then asks for a TA covering site establishment and setout, has asked you for two separate things. This is the second one. Keep it with your SSSP for the job and bring it to the pre-start briefing, because the value is in the crew having read it before the work starts.

Same task, other trades

This task exists in other trades too, and each edition is written for that crew. Compare all 19, or go straight to Cladding & Weatherboards, Concreting, Drainlaying.