TA-DM-16 · Demolition & Strip-out

Confined Space Work Task Analysis

Entry into and work within confined spaces such as pits, tanks, chambers, pipes and vaults encountered during demolition, including identification, permits, atmospheric control, entry, the task and rescue.

What you get

One editable Word document covering confined space work for Demolition & Strip-out: the task broken into steps, the hazards at each step, the controls, and a 5 by 5 risk matrix with residual ratings. Site fields and a crew sign-on are built in.

A Task Analysis is also known as a JSA (Job Safety Analysis) or JSEA. It covers each step of the job, the hazards and the controls.

The steps and hazards it covers

StepHazards
Plan, prepare and confirm competencyWorkers without the required training, competence or authorisation performing the task - incidents arising from lack of skill, competency or authorityDefective or unsafe plant, powered equipment, leads or attachments failing in useWorking on other people's sites, occupied premises or around the public
Identify the confined space and plan entryTreating a confined space as routine demolition work - multiple fatal hazards underestimated
Issue the entry permit and authorisationUnauthorised or uncontrolled entry
Isolate services and inflowsEngulfment by liquids or solids, energisation or flooding of the space
Test the atmosphere before entryOxygen deficiency or enrichment, toxic (H2S, CO) or flammable atmosphere
Ventilate and monitor continuouslyAtmosphere deteriorating during the work
Maintain a standby person and communicationsEntrant collapse going unnoticed - no rescue trigger
Provide entry, egress and retrieval equipmentEntrapment or inability to retrieve an incapacitated entrant
Carry out the demolition task within the spaceTask hazards amplified in the space - fumes, hot work, electrical, dust
Maintain rescue plan and equipmentRescuer death - over half of confined space fatalities are would-be rescuers
Exit, close out and demobilisePerson left in the space, or space left open to the public

Each hazard comes with its control measures, an initial and residual risk rating and the person responsible, ready to check against your job.

How to use it

Read it against the actual job. Delete the hazards that are not there, add the ones that are, fill the site fields, then brief the crew and get every name on the sign-on. A document nobody has read is a piece of paper. One the crew helped finish supports worker consultation and records the agreed work method. Engagement under HSWA ss58 to 59 is an ongoing process of seeking and considering workers’ views, so the signed page is evidence of part of it rather than the whole duty.

About Demolition & Strip-out Task Analysis

This is one of the Task Analysis documents written for Demolition & Strip-out crews. The trade covers soft strip and structural demolition, asbestos and lead, services isolation, exclusion zones, loadout.

See every Demolition & Strip-out document, or the whole pack for $199.99. Need 5 or more templates from this trade? The pack costs less than buying them individually, and saves $49.96 at 5.

Where it sits in the law

New Zealand does not require a document of this name. The duty is to manage risk so far as is reasonably practicable (HSWA s36) and to engage workers on it (ss58 to 59). Use a Task Analysis to plan the work, identify the hazards and communicate the controls to your crew. That is also how you evidence both duties.

WorkSafe names “a task analysis, safe work method statement (SWMS), job safety analysis or equivalent planning document” as the same thing done under different headings, and Site Safe titles one of its own SSSP forms “Task Analysis (TA) and Safe Work Method Statement (SWMS)”. So if the paperwork you have been sent asks for a TA, a SWMS or a JSA, this is the document it means, written to the Health and Safety at Work Act 2015. Only the name changes; the hazards, controls and ratings are the same either way.

Where this sits in your SSSP

A Site-Specific Safety Plan (SSSP) covers the whole job: who is on site, how hazards get reported, what happens in an emergency. A Task Analysis covers one task inside it. They are not the same document. Site Safe’s SSSP pack runs to ten forms, and the Task Analysis is Form 10, filed behind the plan itself.

So a main contractor who asks which SSSP pack you are using, and then asks for a TA covering confined space work, has asked you for two separate things. This is the second one. Keep it with your SSSP for the job and bring it to the pre-start briefing, because the value is in the crew having read it before the work starts.

Same task, other trades

This task exists in other trades too, and each edition is written for that crew. Compare all 6, or go straight to Civil & Earthworks, Drainlaying, Electrical.