DL · SWMS Pack
Drainlaying SWMS Pack
Safe Work Method Statement templates for drainlaying: trench excavation and shoring, foul and stormwater lines, connections and testing, chambers and confined spaces, service strikes, reinstatement, plus the Master Safe Work Method Statement for the general activities in its scope.
What is in the pack
Every document listed below, as editable Word files, headed Safe Work Method Statement. Task Analyses are sold separately, at the same price. Each one is a starting point: you review it against the actual job, delete what is not there, add what is, fill the site fields and brief the crew before it is used.
New to the paperwork for this trade? The hazards that matter for Drainlaying, and what a main contractor will ask for.
Every document in Drainlaying
Before you buy
These are templates, not a finished safety system, and they require site-specific completion. They are written to the Health and Safety at Work Act 2015 and the General Risk and Workplace Management Regulations 2016. New Zealand does not require a document of this name by law; your main contractor asks for one to evidence the risk-management duty under HSWA s36, and support the worker engagement and participation duties under ss58 to 59.Licence terms · Refund policy