CV · Safe Work Method Statements
Civil & Earthworks SWMS templates
Bulk and trench excavation, hydro excavation, drilling and piling, directional boring, pit and drainage.
What you are buying
Each download holds one editable Word document, headed Safe Work Method Statement, with its own Read Me First guide. $49.99. The same task with a Task Analysis heading is sold separately under Task Analysis, at the same price.
Buying 5 or more? The Civil & Earthworks Task Analysis Pack is every document for the trade at $199.99, as Task Analyses.
New to the paperwork for this trade? The hazards that matter for Civil & Earthworks, and what a main contractor will ask for.
Choose a task