Cart

SITE-MAIN-TL · Tiling & Waterproofing

Tiling & Waterproofing SSSP pack, Main Contractor

Tiling and Waterproofing Main Contractor Site Pack with an editable SSSP, Task Analyses, site forms, Excel registers and a six-page guide.

What is in this pack

Everything below is an editable file, listed exactly as it arrives in the download. The task documents are the full Tiling & Waterproofing set, the same ones sold on their own, so buying this pack does not mean buying them again later.

The plan

  • SITE-MAIN-TLSite-Specific Safety Plan, Tiling & Waterproofing

The forms

  • SSSP-MC-F01Project Start and Site Setup Checklist
  • SSSP-MC-F03Contractor Pre Start and Shared Controls Agreement
  • SSSP-MC-F04Site Induction and Worker Acknowledgement
  • SSSP-MC-F05Task Plan Review and Work Start Decision
  • SSSP-MC-F06Daily Site Coordination and Pre Start Record
  • SSSP-MC-F07Controlled Work Authorisation and Permit Check
  • SSSP-MC-F08Site Emergency Response Plan and Exercise Record
  • SSSP-MC-F09Site Inspection Checklist
  • SSSP-MC-F10Toolbox and Worker Consultation Record
  • SSSP-MC-F11Plant and Equipment Site Entry Check
  • SSSP-MC-F12Incident Investigation and Action Form
  • SSSP-MC-F13Visitor Briefing and Access Record
  • SSSP-MC-F15Site Access and Traffic Arrangement

The registers

  • SSSP-MC-R01Contractor and Work Plan Review Register
  • SSSP-MC-R02Site Induction Register
  • SSSP-MC-R03Site Attendance and Visitor Register
  • SSSP-MC-R04Competency and Licence Evidence Index
  • SSSP-MC-R05Site Hazard and Shared Control Register
  • SSSP-MC-R06Task Analysis Review Schedule
  • SSSP-MC-R07Site Inspection and Corrective Action Register
  • SSSP-MC-R08Site Incident and Near Miss Register
  • SSSP-MC-R09Hazardous Substances Inventory
  • SSSP-MC-R10Planned Work Notification and Permit Evidence Log

The task documents

  • TA-TL-01Tiling and Waterproofing - Master Task Analysis
  • TA-TL-02Site Establishment and Setout
  • TA-TL-03Manual Handling
  • TA-TL-04Material Handling, Loading and Unloading
  • TA-TL-05Truck Operations and Deliveries
  • TA-TL-06Floor Covering Removal
  • TA-TL-07Floor Screeding and Bedding
  • TA-TL-08Concrete Grinding and Polishing
  • TA-TL-09Wet Area Waterproofing
  • TA-TL-10Balcony, Podium and External Waterproofing
  • TA-TL-11Wall and Floor Tiling
  • TA-TL-12Hazardous Substances
  • TA-TL-13Working in Private Residences
  • TA-TL-14Silica Dust

The complete Tiling & Waterproofing set. Each covers one task with its hazards, controls and a 5 by 5 risk matrix. See every Tiling & Waterproofing document.

Which role is this

Main Contractor: Tiling and Waterproofing Main Contractor Site Pack with an editable SSSP, Task Analyses, site forms, Excel registers and a six-page guide. Which one you buy follows the position your business holds on site. Choosing one does not by itself satisfy any duty. Compare the three roles.

Before you buy

A reusable template pack, not a completed site plan. A competent person confirms the actual work, site, people and controls, keeps a clean master and saves a job-specific copy. It does not guarantee acceptance by any main contractor or prequalification scheme.