Steel Fixing & Structural Steel SSSP pack, Subcontractor
Steel Fixing and Structural Steel Subcontractor Site Pack with an editable SSSP, Task Analyses, site forms, Excel registers and a six-page guide.
What is in this pack
Everything below is an editable file, listed exactly as it arrives in the download. The task documents are a selected core set for a subcontractor, not the whole Steel Fixing & Structural Steel catalogue. Every one is listed below, so you can see exactly which before you buy. The rest are sold separately, or together in the Steel Fixing & Structural Steel Task Analysis Pack.
The plan
- SITE-SUB-STSite-Specific Safety Plan, Steel Fixing & Structural Steel
The forms
- SSSP-SC-F03Main Contractor Coordination and Record Locations
- SSSP-SC-F05Worker Briefing and Acknowledgement Record
- SSSP-SC-F07Incident and Near Miss Notification Record
- SSSP-SC-F09Lower Tier Subcontractor Coordination Record
The registers
- SSSP-SC-R01Task Analysis Schedule
- SSSP-SC-R02Competency and Licence Evidence Index
- SSSP-SC-R03Hazardous Substances Inventory
- SSSP-SC-R04Site Hazard and Shared Control Register
The task documents
- TA-ST-01Steel Fixing and Structural Steel - Master Task Analysis
- TA-ST-06Reinforcement Cutting and Bending
- TA-ST-07Steel Fixing
- TA-ST-08Reinforcement Cage Lifting and Installation
- TA-ST-09Dogging and Crane Lifting (Mobile Crane)
The core set for a subcontractor. Each covers one task with its hazards, controls and a 5 by 5 risk matrix. See every Steel Fixing & Structural Steel document.
Which role is this
Subcontractor: Steel Fixing and Structural Steel Subcontractor Site Pack with an editable SSSP, Task Analyses, site forms, Excel registers and a six-page guide. Which one you buy follows the position your business holds on site. Choosing one does not by itself satisfy any duty. Compare the three roles.
Before you buy
A reusable template pack, not a completed site plan. A competent person confirms the actual work, site, people and controls, keeps a clean master and saves a job-specific copy. It does not guarantee acceptance by any main contractor or prequalification scheme.