Cart

SSSP-STARTER-STEEL-FIXING-STRUCTURAL-STEEL · Steel Fixing & Structural Steel

Steel Fixing & Structural Steel SSSP Starter Pack

Editable Steel Fixing and Structural Steel Subcontractor Site Specific Safety Plan and selected Task Analyses (Steel Fixing and Structural Steel - Master Task Analysis, Steel Fixing, Dogging and Crane Lifting (Mobile Crane)) for New Zealand work.

What is in this pack

The Steel Fixing & Structural Steel Site-Specific Safety Plan and the Task Analyses a steel fixing & structural steel business is asked for most often, in one download. Each Task Analysis is an editable Word document. Safe Work Method Statements are sold separately, one per task, if that is the heading your site asks for.

The plan

  • SSSP-STARTER-STEEL-FIXING-STRUCTURAL-STEELSite-Specific Safety Plan, Steel Fixing & Structural Steel

The core Task Analyses

  • TA-ST-01Steel Fixing and Structural Steel - Master Task Analysis
  • TA-ST-07Steel Fixing
  • TA-ST-09Dogging and Crane Lifting (Mobile Crane)

Every Steel Fixing & Structural Steel document is available separately, as are the matching Safe Work Method Statements.

Before you buy

A reusable template pack, not a completed site plan. A competent person confirms the actual work, site, people and controls, keeps a clean master and saves a job-specific copy. It does not guarantee acceptance by any main contractor or prequalification scheme.