SITE-MAIN-ST · Steel Fixing & Structural Steel
Steel Fixing & Structural Steel SSSP pack, Main Contractor
Steel Fixing and Structural Steel Main Contractor Site Pack with an editable SSSP, Task Analyses, site forms, Excel registers and a six-page guide.
What is in this pack
Everything below is an editable file, listed exactly as it arrives in the download. The task documents are the full Steel Fixing & Structural Steel set, the same ones sold on their own, so buying this pack does not mean buying them again later.
The plan
- SITE-MAIN-STSite-Specific Safety Plan, Steel Fixing & Structural Steel
The forms
- SSSP-MC-F01Project Start and Site Setup Checklist
- SSSP-MC-F03Contractor Pre Start and Shared Controls Agreement
- SSSP-MC-F04Site Induction and Worker Acknowledgement
- SSSP-MC-F05Task Plan Review and Work Start Decision
- SSSP-MC-F06Daily Site Coordination and Pre Start Record
- SSSP-MC-F07Controlled Work Authorisation and Permit Check
- SSSP-MC-F08Site Emergency Response Plan and Exercise Record
- SSSP-MC-F09Site Inspection Checklist
- SSSP-MC-F10Toolbox and Worker Consultation Record
- SSSP-MC-F11Plant and Equipment Site Entry Check
- SSSP-MC-F12Incident Investigation and Action Form
- SSSP-MC-F13Visitor Briefing and Access Record
- SSSP-MC-F15Site Access and Traffic Arrangement
The registers
- SSSP-MC-R01Contractor and Work Plan Review Register
- SSSP-MC-R02Site Induction Register
- SSSP-MC-R03Site Attendance and Visitor Register
- SSSP-MC-R04Competency and Licence Evidence Index
- SSSP-MC-R05Site Hazard and Shared Control Register
- SSSP-MC-R06Task Analysis Review Schedule
- SSSP-MC-R07Site Inspection and Corrective Action Register
- SSSP-MC-R08Site Incident and Near Miss Register
- SSSP-MC-R09Hazardous Substances Inventory
- SSSP-MC-R10Planned Work Notification and Permit Evidence Log
The task documents
- TA-ST-01Steel Fixing and Structural Steel - Master Task Analysis
- TA-ST-02Site Establishment and Setout
- TA-ST-03Manual Handling
- TA-ST-04Material Handling, Loading and Unloading
- TA-ST-05Truck Operations and Deliveries
- TA-ST-06Reinforcement Cutting and Bending
- TA-ST-07Steel Fixing
- TA-ST-08Reinforcement Cage Lifting and Installation
- TA-ST-09Dogging and Crane Lifting (Mobile Crane)
- TA-ST-10Working at Heights - On Structure
- TA-ST-11Hazardous Substances
- TA-ST-12On-Site Steel Fabrication and Modification
- TA-ST-13Structural Steel Erection
- TA-ST-14Shed and Light Steel Structure Construction
- TA-ST-15Handrail Installation
- TA-ST-16Welding and Hot Works
- TA-ST-17Structural Steel Crane Lifting and Placement
- TA-ST-18EWP Operations
- TA-ST-19Telehandler
- TA-ST-20Abrasive Blasting
The complete Steel Fixing & Structural Steel set. Each covers one task with its hazards, controls and a 5 by 5 risk matrix. See every Steel Fixing & Structural Steel document.
Which role is this
Main Contractor: Steel Fixing and Structural Steel Main Contractor Site Pack with an editable SSSP, Task Analyses, site forms, Excel registers and a six-page guide. Which one you buy follows the position your business holds on site. Choosing one does not by itself satisfy any duty. Compare the three roles.
Before you buy
A reusable template pack, not a completed site plan. A competent person confirms the actual work, site, people and controls, keeps a clean master and saves a job-specific copy. It does not guarantee acceptance by any main contractor or prequalification scheme.