Cart

SITE-MAIN-ST · Steel Fixing & Structural Steel

Steel Fixing & Structural Steel SSSP pack, Main Contractor

Steel Fixing and Structural Steel Main Contractor Site Pack with an editable SSSP, Task Analyses, site forms, Excel registers and a six-page guide.

What is in this pack

Everything below is an editable file, listed exactly as it arrives in the download. The task documents are the full Steel Fixing & Structural Steel set, the same ones sold on their own, so buying this pack does not mean buying them again later.

The plan

  • SITE-MAIN-STSite-Specific Safety Plan, Steel Fixing & Structural Steel

The forms

  • SSSP-MC-F01Project Start and Site Setup Checklist
  • SSSP-MC-F03Contractor Pre Start and Shared Controls Agreement
  • SSSP-MC-F04Site Induction and Worker Acknowledgement
  • SSSP-MC-F05Task Plan Review and Work Start Decision
  • SSSP-MC-F06Daily Site Coordination and Pre Start Record
  • SSSP-MC-F07Controlled Work Authorisation and Permit Check
  • SSSP-MC-F08Site Emergency Response Plan and Exercise Record
  • SSSP-MC-F09Site Inspection Checklist
  • SSSP-MC-F10Toolbox and Worker Consultation Record
  • SSSP-MC-F11Plant and Equipment Site Entry Check
  • SSSP-MC-F12Incident Investigation and Action Form
  • SSSP-MC-F13Visitor Briefing and Access Record
  • SSSP-MC-F15Site Access and Traffic Arrangement

The registers

  • SSSP-MC-R01Contractor and Work Plan Review Register
  • SSSP-MC-R02Site Induction Register
  • SSSP-MC-R03Site Attendance and Visitor Register
  • SSSP-MC-R04Competency and Licence Evidence Index
  • SSSP-MC-R05Site Hazard and Shared Control Register
  • SSSP-MC-R06Task Analysis Review Schedule
  • SSSP-MC-R07Site Inspection and Corrective Action Register
  • SSSP-MC-R08Site Incident and Near Miss Register
  • SSSP-MC-R09Hazardous Substances Inventory
  • SSSP-MC-R10Planned Work Notification and Permit Evidence Log

The task documents

  • TA-ST-01Steel Fixing and Structural Steel - Master Task Analysis
  • TA-ST-02Site Establishment and Setout
  • TA-ST-03Manual Handling
  • TA-ST-04Material Handling, Loading and Unloading
  • TA-ST-05Truck Operations and Deliveries
  • TA-ST-06Reinforcement Cutting and Bending
  • TA-ST-07Steel Fixing
  • TA-ST-08Reinforcement Cage Lifting and Installation
  • TA-ST-09Dogging and Crane Lifting (Mobile Crane)
  • TA-ST-10Working at Heights - On Structure
  • TA-ST-11Hazardous Substances
  • TA-ST-12On-Site Steel Fabrication and Modification
  • TA-ST-13Structural Steel Erection
  • TA-ST-14Shed and Light Steel Structure Construction
  • TA-ST-15Handrail Installation
  • TA-ST-16Welding and Hot Works
  • TA-ST-17Structural Steel Crane Lifting and Placement
  • TA-ST-18EWP Operations
  • TA-ST-19Telehandler
  • TA-ST-20Abrasive Blasting

The complete Steel Fixing & Structural Steel set. Each covers one task with its hazards, controls and a 5 by 5 risk matrix. See every Steel Fixing & Structural Steel document.

Which role is this

Main Contractor: Steel Fixing and Structural Steel Main Contractor Site Pack with an editable SSSP, Task Analyses, site forms, Excel registers and a six-page guide. Which one you buy follows the position your business holds on site. Choosing one does not by itself satisfy any duty. Compare the three roles.

Before you buy

A reusable template pack, not a completed site plan. A competent person confirms the actual work, site, people and controls, keeps a clean master and saves a job-specific copy. It does not guarantee acceptance by any main contractor or prequalification scheme.