Cart

SITE-MAIN-RB · Residential Building & Carpentry

Residential Building & Carpentry SSSP pack, Main Contractor

For a main contractor managing site-wide arrangements and other PCBUs.

What is in this pack

Everything below is an editable file, listed exactly as it arrives in the download. The task documents are the full Residential Building & Carpentry set, the same ones sold on their own, so buying this pack does not mean buying them again later.

The plan

  • SITE-MAIN-RBSite-Specific Safety Plan, Residential Building & Carpentry

The forms

  • SSSP-MC-F01Project Start and Site Setup Checklist
  • SSSP-MC-F03Contractor Pre Start and Shared Controls Agreement
  • SSSP-MC-F04Site Induction and Worker Acknowledgement
  • SSSP-MC-F05Task Plan Review and Work Start Decision
  • SSSP-MC-F06Daily Site Coordination and Pre Start Record
  • SSSP-MC-F07Controlled Work Authorisation and Permit Check
  • SSSP-MC-F08Site Emergency Response Plan and Exercise Record
  • SSSP-MC-F09Site Inspection Checklist
  • SSSP-MC-F10Toolbox and Worker Consultation Record
  • SSSP-MC-F11Plant and Equipment Site Entry Check
  • SSSP-MC-F12Incident Investigation and Action Form
  • SSSP-MC-F13Visitor Briefing and Access Record
  • SSSP-MC-F15Site Access and Traffic Arrangement

The registers

  • SSSP-MC-R01Contractor and Work Plan Review Register
  • SSSP-MC-R02Site Induction Register
  • SSSP-MC-R03Site Attendance and Visitor Register
  • SSSP-MC-R04Competency and Licence Evidence Index
  • SSSP-MC-R05Site Hazard and Shared Control Register
  • SSSP-MC-R06Task Analysis Review Schedule
  • SSSP-MC-R07Site Inspection and Corrective Action Register
  • SSSP-MC-R08Site Incident and Near Miss Register
  • SSSP-MC-R09Hazardous Substances Inventory
  • SSSP-MC-R10Planned Work Notification and Permit Evidence Log

The task documents

  • TA-RB-01Residential Building and Carpentry - Master Task Analysis
  • TA-RB-02Site Establishment and Setout
  • TA-RB-03Site Mobilisation
  • TA-RB-04Manual Handling
  • TA-RB-06Soft Demolition - Strip-Out
  • TA-RB-07Demolition
  • TA-RB-08Excavation and Spoil Disposal (incl. Near Assets)
  • TA-RB-09Trench Excavation
  • TA-RB-10Service Location (Non-invasive)
  • TA-RB-11Concrete Foundations - Excavating and Pouring
  • TA-RB-12Concrete Slab on Ground
  • TA-RB-13Steel Fixing
  • TA-RB-14Formwork
  • TA-RB-15Bricklaying and Blocklaying
  • TA-RB-16Framing and Trusses (Timber - Steel)
  • TA-RB-17Roof Access and Edge Protection
  • TA-RB-18Roofing Installation
  • TA-RB-20Carpentry
  • TA-RB-21Lock-Up and Fix-Out Carpentry
  • TA-RB-22Stairs Installation
  • TA-RB-24Plasterboard Installation
  • TA-RB-25Wet Area Waterproofing
  • TA-RB-26Wall and Floor Tiling
  • TA-RB-27Painting
  • TA-RB-28Rough-in and Final Fit-out Plumbing
  • TA-RB-29Electrical Renovations
  • TA-RB-30Site Furniture Installation
  • TA-RB-31Scaffolding (Fixed and Mobile Tower)
  • TA-RB-32EWP Operations
  • TA-RB-33Forklift Operations
  • TA-RB-34Height Access Equipment
  • TA-RB-35Working at Height - On Structure
  • TA-RB-36Working Near Overhead Power Lines
  • TA-RB-37Confined Space Work
  • TA-RB-38Hazardous Substances
  • TA-RB-39Working in Private Residences
  • TA-RB-40Telehandler
  • TA-RB-41On-Site Material Handling
  • TA-RB-42Truck Operations and Deliveries
  • TA-RB-43Cladding Installation
  • TA-RB-44Cladding - Rope Access and Swing Stage
  • TA-RB-45Decking
  • TA-RB-46Raised Timber Floors
  • TA-RB-47Timber Floor Laying
  • TA-RB-48Handrail and Balustrade Installation
  • TA-RB-49Cabinet Installation

The complete Residential Building & Carpentry set. Each covers one task with its hazards, controls and a 5 by 5 risk matrix. See every Residential Building & Carpentry document.

Which role is this

Main Contractor: For a main contractor managing site-wide arrangements and other PCBUs. Which one you buy follows the position your business holds on site. Choosing one does not by itself satisfy any duty. Compare the three roles.

Before you buy

A reusable template pack, not a completed site plan. A competent person confirms the actual work, site, people and controls, keeps a clean master and saves a job-specific copy. It does not guarantee acceptance by any main contractor or prequalification scheme.