Cart

SITE-MAIN-LG · Landscaping & Grounds

Landscaping & Grounds SSSP pack, Main Contractor

For a main contractor managing site-wide arrangements and other PCBUs.

What is in this pack

Everything below is an editable file, listed exactly as it arrives in the download. The task documents are the full Landscaping & Grounds set, the same ones sold on their own, so buying this pack does not mean buying them again later.

The plan

  • SITE-MAIN-LGSite-Specific Safety Plan, Landscaping & Grounds

The forms

  • SSSP-MC-F01Project Start and Site Setup Checklist
  • SSSP-MC-F03Contractor Pre Start and Shared Controls Agreement
  • SSSP-MC-F04Site Induction and Worker Acknowledgement
  • SSSP-MC-F05Task Plan Review and Work Start Decision
  • SSSP-MC-F06Daily Site Coordination and Pre Start Record
  • SSSP-MC-F07Controlled Work Authorisation and Permit Check
  • SSSP-MC-F08Site Emergency Response Plan and Exercise Record
  • SSSP-MC-F09Site Inspection Checklist
  • SSSP-MC-F10Toolbox and Worker Consultation Record
  • SSSP-MC-F11Plant and Equipment Site Entry Check
  • SSSP-MC-F12Incident Investigation and Action Form
  • SSSP-MC-F13Visitor Briefing and Access Record
  • SSSP-MC-F15Site Access and Traffic Arrangement

The registers

  • SSSP-MC-R01Contractor and Work Plan Review Register
  • SSSP-MC-R02Site Induction Register
  • SSSP-MC-R03Site Attendance and Visitor Register
  • SSSP-MC-R04Competency and Licence Evidence Index
  • SSSP-MC-R05Site Hazard and Shared Control Register
  • SSSP-MC-R06Task Analysis Review Schedule
  • SSSP-MC-R07Site Inspection and Corrective Action Register
  • SSSP-MC-R08Site Incident and Near Miss Register
  • SSSP-MC-R09Hazardous Substances Inventory
  • SSSP-MC-R10Planned Work Notification and Permit Evidence Log

The task documents

  • TA-LG-01Landscaping and Grounds - Master Task Analysis
  • TA-LG-02Site Establishment and Setout
  • TA-LG-03Manual Handling
  • TA-LG-04Material Handling, Loading and Unloading
  • TA-LG-05Truck Operations and Deliveries
  • TA-LG-06Plant Operations
  • TA-LG-07Demolition
  • TA-LG-08Excavation and Trenching
  • TA-LG-09Crushed Rock and Compaction
  • TA-LG-10Drainage Installation
  • TA-LG-11Concrete Works
  • TA-LG-12Retaining Walls
  • TA-LG-13Precast and Stone Installation
  • TA-LG-14Steel and Timber Works
  • TA-LG-15Paving
  • TA-LG-16Soft Landscaping
  • TA-LG-17Planter and Pot Installation
  • TA-LG-18Irrigation
  • TA-LG-19Synthetic Grass
  • TA-LG-20Softfall Rubber
  • TA-LG-21Playground Construction
  • TA-LG-22Shade Structures and Canopies
  • TA-LG-23Trellis Installation
  • TA-LG-24Furniture Installation
  • TA-LG-25Tactiles, Stair Nosing and Line Marking
  • TA-LG-26Waterproofing
  • TA-LG-27Working at Height - On Structure
  • TA-LG-28EWP Operations
  • TA-LG-29Crane and Lifting Operations
  • TA-LG-30Roads and Traffic Management
  • TA-LG-31Hazardous Substances
  • TA-LG-32Landscape Maintenance
  • TA-LG-33Grassing - Instant Turf and Hydroseeding
  • TA-LG-34Water Features
  • TA-LG-35Tractor Slashing
  • TA-LG-36Shade Sail Installation
  • TA-LG-37Site Assessment and Mobile Works Setup
  • TA-LG-38Truck, Trailer and Equipment Transport
  • TA-LG-39Ride-On and Push Mowing
  • TA-LG-40Brushcutting and Edging
  • TA-LG-41Hedge Trimming
  • TA-LG-42Ground-Based Pruning and Small Tree Work
  • TA-LG-43Blowing and Site Clean-up
  • TA-LG-44Chemical Spraying and Weed Control
  • TA-LG-45Fertilising and Top Dressing
  • TA-LG-46Irrigation Maintenance and Repairs
  • TA-LG-47Garden Bed Maintenance, Mulching and Planting
  • TA-LG-48Green Waste Handling and Small Chipper Operation
  • TA-LG-49Working in Public Spaces, Schools and Aged Care Grounds
  • TA-LG-50Working in Private Residences
  • TA-LG-51Plant and Tree Installation

The complete Landscaping & Grounds set. Each covers one task with its hazards, controls and a 5 by 5 risk matrix. See every Landscaping & Grounds document.

Which role is this

Main Contractor: For a main contractor managing site-wide arrangements and other PCBUs. Which one you buy follows the position your business holds on site. Choosing one does not by itself satisfy any duty. Compare the three roles.

Before you buy

A reusable template pack, not a completed site plan. A competent person confirms the actual work, site, people and controls, keeps a clean master and saves a job-specific copy. It does not guarantee acceptance by any main contractor or prequalification scheme.