Cart

SITE-MAIN-IS · Interior Systems

Interior Systems SSSP pack, Main Contractor

Interior Systems Main Contractor Site Pack with an editable SSSP, Task Analyses, site forms, Excel registers and a six-page guide.

What is in this pack

Everything below is an editable file, listed exactly as it arrives in the download. The task documents are the full Interior Systems set, the same ones sold on their own, so buying this pack does not mean buying them again later.

The plan

  • SITE-MAIN-ISSite-Specific Safety Plan, Interior Systems

The forms

  • SSSP-MC-F01Project Start and Site Setup Checklist
  • SSSP-MC-F03Contractor Pre Start and Shared Controls Agreement
  • SSSP-MC-F04Site Induction and Worker Acknowledgement
  • SSSP-MC-F05Task Plan Review and Work Start Decision
  • SSSP-MC-F06Daily Site Coordination and Pre Start Record
  • SSSP-MC-F07Controlled Work Authorisation and Permit Check
  • SSSP-MC-F08Site Emergency Response Plan and Exercise Record
  • SSSP-MC-F09Site Inspection Checklist
  • SSSP-MC-F10Toolbox and Worker Consultation Record
  • SSSP-MC-F11Plant and Equipment Site Entry Check
  • SSSP-MC-F12Incident Investigation and Action Form
  • SSSP-MC-F13Visitor Briefing and Access Record
  • SSSP-MC-F15Site Access and Traffic Arrangement

The registers

  • SSSP-MC-R01Contractor and Work Plan Review Register
  • SSSP-MC-R02Site Induction Register
  • SSSP-MC-R03Site Attendance and Visitor Register
  • SSSP-MC-R04Competency and Licence Evidence Index
  • SSSP-MC-R05Site Hazard and Shared Control Register
  • SSSP-MC-R06Task Analysis Review Schedule
  • SSSP-MC-R07Site Inspection and Corrective Action Register
  • SSSP-MC-R08Site Incident and Near Miss Register
  • SSSP-MC-R09Hazardous Substances Inventory
  • SSSP-MC-R10Planned Work Notification and Permit Evidence Log

The task documents

  • TA-IS-01Interior Systems (GIB Fixing and Plastering) - Master Task Analysis
  • TA-IS-02Site Establishment and Setout
  • TA-IS-03Manual Handling
  • TA-IS-04Material Handling, Loading and Unloading
  • TA-IS-05Steel Stud and Track Partition Installation
  • TA-IS-06Plasterboard Installation
  • TA-IS-07Suspended Ceiling Grid Installation
  • TA-IS-08Ceiling Tile and Panel Installation
  • TA-IS-09Bulkheads and Feature Ceilings
  • TA-IS-10Setting, Jointing and Sanding
  • TA-IS-11EWP Operations
  • TA-IS-12Working at Heights - On Structure
  • TA-IS-13Working in Private Residences
  • TA-IS-14Hazardous Substances
  • TA-IS-15Cornice and Decorative Plaster Installation
  • TA-IS-16Solid Plastering and Cement Rendering
  • TA-IS-17Render Removal, Surface Preparation and Repairs
  • TA-IS-18Rendering - Mixing, Application and Finishing

The complete Interior Systems set. Each covers one task with its hazards, controls and a 5 by 5 risk matrix. See every Interior Systems document.

Which role is this

Main Contractor: Interior Systems Main Contractor Site Pack with an editable SSSP, Task Analyses, site forms, Excel registers and a six-page guide. Which one you buy follows the position your business holds on site. Choosing one does not by itself satisfy any duty. Compare the three roles.

Before you buy

A reusable template pack, not a completed site plan. A competent person confirms the actual work, site, people and controls, keeps a clean master and saves a job-specific copy. It does not guarantee acceptance by any main contractor or prequalification scheme.