SITE-IND-HV · HVAC & Refrigeration
HVAC & Refrigeration SSSP pack, Independent Contractor
For a trade business running its own work area and system alongside the main contractor.
What is in this pack
Everything below is an editable file, listed exactly as it arrives in the download. The task documents are the full HVAC & Refrigeration set, the same ones sold on their own, so buying this pack does not mean buying them again later.
The plan
- SITE-IND-HVSite-Specific Safety Plan, HVAC & Refrigeration
The forms
- SSSP-IC-F03PCBU Interface and Shared Control Agreement
- SSSP-IC-F05Worker Briefing and Toolbox Record
- SSSP-IC-F07Work Area Inspection and Corrective Action Record
- SSSP-IC-F08Incident Near Miss and Follow Up Record
- SSSP-IC-F09Emergency Interface and Task Rescue Reference
- SSSP-IC-F11Lower Tier Subcontractor Coordination Record
The registers
- SSSP-IC-R01Task Analysis Schedule
- SSSP-IC-R02Competency and Licence Evidence Index
- SSSP-IC-R03Hazardous Substances Inventory
- SSSP-IC-R04Site Hazard and Shared Control Register
The task documents
- TA-HV-01HVAC and Refrigeration - Master Task Analysis
- TA-HV-02Site Establishment and Setout
- TA-HV-03Manual Handling
- TA-HV-04Material Handling, Loading and Unloading
- TA-HV-05Truck Operations and Deliveries
- TA-HV-06Concrete Chasing
- TA-HV-07Air Conditioning Installation
- TA-HV-08AC Service and Repairs
- TA-HV-09Ductwork Installation
- TA-HV-10Mechanical Ventilation System
- TA-HV-11Mechanical Pipework
- TA-HV-12Cool Room Construction
- TA-HV-13Cool Room Repair
- TA-HV-14Refrigeration
- TA-HV-15Refrigerant Gas Handling
- TA-HV-16EWP Operations
- TA-HV-17Working at Height - On Structure
- TA-HV-18Working in Roof Spaces
- TA-HV-19Hazardous Substances
- TA-HV-20Working in Private Residences
- TA-HV-21UV Light Installation
- TA-HV-22Lock Out Tag Out (LOTO)
- TA-HV-23Test and Tag
The complete HVAC & Refrigeration set. Each covers one task with its hazards, controls and a 5 by 5 risk matrix. See every HVAC & Refrigeration document.
Which role is this
Independent Contractor: For a trade business running its own work area and system alongside the main contractor. Which one you buy follows the position your business holds on site. Choosing one does not by itself satisfy any duty. Compare the three roles.
Before you buy
A reusable template pack, not a completed site plan. A competent person confirms the actual work, site, people and controls, keeps a clean master and saves a job-specific copy. It does not guarantee acceptance by any main contractor or prequalification scheme.