Cart
Home/SSSP packs/Fencing/Independent Contractor

SITE-IND-FN · Fencing

Fencing SSSP pack, Independent Contractor

Fencing Independent Contractor Site Pack with an editable SSSP, Task Analyses, site forms, Excel registers and a six-page guide.

What is in this pack

Everything below is an editable file, listed exactly as it arrives in the download. The task documents are the full Fencing set, the same ones sold on their own, so buying this pack does not mean buying them again later.

The plan

  • SITE-IND-FNSite-Specific Safety Plan, Fencing

The forms

  • SSSP-IC-F03PCBU Interface and Shared Control Agreement
  • SSSP-IC-F05Worker Briefing and Toolbox Record
  • SSSP-IC-F07Work Area Inspection and Corrective Action Record
  • SSSP-IC-F08Incident Near Miss and Follow Up Record
  • SSSP-IC-F09Emergency Interface and Task Rescue Reference
  • SSSP-IC-F11Lower Tier Subcontractor Coordination Record

The registers

  • SSSP-IC-R01Task Analysis Schedule
  • SSSP-IC-R02Competency and Licence Evidence Index
  • SSSP-IC-R03Hazardous Substances Inventory
  • SSSP-IC-R04Site Hazard and Shared Control Register

The task documents

  • TA-FN-01Fencing - Master Task Analysis
  • TA-FN-02Site Establishment and Setout
  • TA-FN-03Manual Handling
  • TA-FN-04Material Handling, Loading and Unloading
  • TA-FN-05Truck Operations and Deliveries
  • TA-FN-06Fence Installation
  • TA-FN-07Temporary Fencing Installation
  • TA-FN-08Pool Fence and Barrier Installation
  • TA-FN-09Electric and Rural Fencing
  • TA-FN-10Sediment Fencing
  • TA-FN-11Hazardous Substances
  • TA-FN-12Working in Private Residences
  • TA-FN-13Workshop Machinery Operation
  • TA-FN-14Welding and Hot Works

The complete Fencing set. Each covers one task with its hazards, controls and a 5 by 5 risk matrix. See every Fencing document.

Which role is this

Independent Contractor: Fencing Independent Contractor Site Pack with an editable SSSP, Task Analyses, site forms, Excel registers and a six-page guide. Which one you buy follows the position your business holds on site. Choosing one does not by itself satisfy any duty. Compare the three roles.

Before you buy

A reusable template pack, not a completed site plan. A competent person confirms the actual work, site, people and controls, keeps a clean master and saves a job-specific copy. It does not guarantee acceptance by any main contractor or prequalification scheme.