Cart
Home/SSSP packs/Drainlaying/Independent Contractor

SITE-IND-DL · Drainlaying

Drainlaying SSSP pack, Independent Contractor

Drainlaying Independent Contractor Site Pack with an editable SSSP, Task Analyses, site forms, Excel registers and a six-page guide.

What is in this pack

Everything below is an editable file, listed exactly as it arrives in the download. The task documents are the full Drainlaying set, the same ones sold on their own, so buying this pack does not mean buying them again later.

The plan

  • SITE-IND-DLSite-Specific Safety Plan, Drainlaying

The forms

  • SSSP-IC-F03PCBU Interface and Shared Control Agreement
  • SSSP-IC-F05Worker Briefing and Toolbox Record
  • SSSP-IC-F07Work Area Inspection and Corrective Action Record
  • SSSP-IC-F08Incident Near Miss and Follow Up Record
  • SSSP-IC-F09Emergency Interface and Task Rescue Reference
  • SSSP-IC-F11Lower Tier Subcontractor Coordination Record

The registers

  • SSSP-IC-R01Task Analysis Schedule
  • SSSP-IC-R02Competency and Licence Evidence Index
  • SSSP-IC-R03Hazardous Substances Inventory
  • SSSP-IC-R04Site Hazard and Shared Control Register

The task documents

  • TA-DL-01Drainlaying - Master Task Analysis
  • TA-DL-02Site Establishment and Setout
  • TA-DL-03Manual Handling
  • TA-DL-04Service Location and Detection
  • TA-DL-05Excavation and Trenching (incl. Near Assets)
  • TA-DL-06Underground Drainage Installation
  • TA-DL-07Drain Cleaning - CCTV, Jetting and Electric Eel
  • TA-DL-08Pipe Relining (CIPP)
  • TA-DL-09Pipe Bursting and Trenchless Replacement
  • TA-DL-10Pit, Chamber and Live Sewer Connection Work
  • TA-DL-11Blocked Drain Call-out and Emergency Response
  • TA-DL-12Confined Space Work
  • TA-DL-13Traffic Control (STOP-GO Paddle)
  • TA-DL-14Hazardous Substances
  • TA-DL-15Working in Private Residences
  • TA-DL-16Trenchless Works (Boring and Pipe Jacking)
  • TA-DL-17Poly Pipe Welding (Electrofusion and Butt Fusion)
  • TA-DL-18Wastewater Reclamation Unit

The complete Drainlaying set. Each covers one task with its hazards, controls and a 5 by 5 risk matrix. See every Drainlaying document.

Which role is this

Independent Contractor: Drainlaying Independent Contractor Site Pack with an editable SSSP, Task Analyses, site forms, Excel registers and a six-page guide. Which one you buy follows the position your business holds on site. Choosing one does not by itself satisfy any duty. Compare the three roles.

Before you buy

A reusable template pack, not a completed site plan. A competent person confirms the actual work, site, people and controls, keeps a clean master and saves a job-specific copy. It does not guarantee acceptance by any main contractor or prequalification scheme.