Cart

SITE-SUB-DM · Demolition & Strip-out

Demolition & Strip-out SSSP pack, Subcontractor

Demolition and Strip-out Subcontractor Site Pack with an editable SSSP, Task Analyses, site forms, Excel registers and a six-page guide.

What is in this pack

Everything below is an editable file, listed exactly as it arrives in the download. The task documents are a selected core set for a subcontractor, not the whole Demolition & Strip-out catalogue. Every one is listed below, so you can see exactly which before you buy. The rest are sold separately, or together in the Demolition & Strip-out Task Analysis Pack.

The plan

  • SITE-SUB-DMSite-Specific Safety Plan, Demolition & Strip-out

The forms

  • SSSP-SC-F03Main Contractor Coordination and Record Locations
  • SSSP-SC-F05Worker Briefing and Acknowledgement Record
  • SSSP-SC-F07Incident and Near Miss Notification Record
  • SSSP-SC-F09Lower Tier Subcontractor Coordination Record

The registers

  • SSSP-SC-R01Task Analysis Schedule
  • SSSP-SC-R02Competency and Licence Evidence Index
  • SSSP-SC-R03Hazardous Substances Inventory
  • SSSP-SC-R04Site Hazard and Shared Control Register

The task documents

  • TA-DM-01Demolition and Strip-out - Master Task Analysis
  • TA-DM-06Soft Demolition - Strip-Out
  • TA-DM-07Demolition (Structural)
  • TA-DM-08Electrical Demolition
  • TA-DM-10Roofing Removal

The core set for a subcontractor. Each covers one task with its hazards, controls and a 5 by 5 risk matrix. See every Demolition & Strip-out document.

Which role is this

Subcontractor: Demolition and Strip-out Subcontractor Site Pack with an editable SSSP, Task Analyses, site forms, Excel registers and a six-page guide. Which one you buy follows the position your business holds on site. Choosing one does not by itself satisfy any duty. Compare the three roles.

Before you buy

A reusable template pack, not a completed site plan. A competent person confirms the actual work, site, people and controls, keeps a clean master and saves a job-specific copy. It does not guarantee acceptance by any main contractor or prequalification scheme.