SITE-MAIN-DM · Demolition & Strip-out
Demolition & Strip-out SSSP pack, Main Contractor
Demolition and Strip-out Main Contractor Site Pack with an editable SSSP, Task Analyses, site forms, Excel registers and a six-page guide.
What is in this pack
Everything below is an editable file, listed exactly as it arrives in the download. The task documents are the full Demolition & Strip-out set, the same ones sold on their own, so buying this pack does not mean buying them again later.
The plan
- SITE-MAIN-DMSite-Specific Safety Plan, Demolition & Strip-out
The forms
- SSSP-MC-F01Project Start and Site Setup Checklist
- SSSP-MC-F03Contractor Pre Start and Shared Controls Agreement
- SSSP-MC-F04Site Induction and Worker Acknowledgement
- SSSP-MC-F05Task Plan Review and Work Start Decision
- SSSP-MC-F06Daily Site Coordination and Pre Start Record
- SSSP-MC-F07Controlled Work Authorisation and Permit Check
- SSSP-MC-F08Site Emergency Response Plan and Exercise Record
- SSSP-MC-F09Site Inspection Checklist
- SSSP-MC-F10Toolbox and Worker Consultation Record
- SSSP-MC-F11Plant and Equipment Site Entry Check
- SSSP-MC-F12Incident Investigation and Action Form
- SSSP-MC-F13Visitor Briefing and Access Record
- SSSP-MC-F15Site Access and Traffic Arrangement
The registers
- SSSP-MC-R01Contractor and Work Plan Review Register
- SSSP-MC-R02Site Induction Register
- SSSP-MC-R03Site Attendance and Visitor Register
- SSSP-MC-R04Competency and Licence Evidence Index
- SSSP-MC-R05Site Hazard and Shared Control Register
- SSSP-MC-R06Task Analysis Review Schedule
- SSSP-MC-R07Site Inspection and Corrective Action Register
- SSSP-MC-R08Site Incident and Near Miss Register
- SSSP-MC-R09Hazardous Substances Inventory
- SSSP-MC-R10Planned Work Notification and Permit Evidence Log
The task documents
- TA-DM-01Demolition and Strip-out - Master Task Analysis
- TA-DM-02Site Establishment and Setout
- TA-DM-03Manual Handling
- TA-DM-04Material Handling, Loading and Unloading
- TA-DM-05Truck Operations and Deliveries
- TA-DM-06Soft Demolition - Strip-Out
- TA-DM-07Demolition (Structural)
- TA-DM-08Electrical Demolition
- TA-DM-09Floor Covering Removal
- TA-DM-10Roofing Removal
- TA-DM-11Cladding Removal - Rope Access
- TA-DM-12Cladding Removal - Swing Stage
- TA-DM-13Concrete Demolition (Ultra High Pressure Water)
- TA-DM-14Mobile Concrete Crusher
- TA-DM-15Acrow Props
- TA-DM-16Confined Space Work
- TA-DM-17Working at Heights - On Structure
- TA-DM-18Working Near Overhead Power Lines
- TA-DM-19Hazardous Substances
- TA-DM-20Working in Private Residences
- TA-DM-21Silica Dust
The complete Demolition & Strip-out set. Each covers one task with its hazards, controls and a 5 by 5 risk matrix. See every Demolition & Strip-out document.
Which role is this
Main Contractor: Demolition and Strip-out Main Contractor Site Pack with an editable SSSP, Task Analyses, site forms, Excel registers and a six-page guide. Which one you buy follows the position your business holds on site. Choosing one does not by itself satisfy any duty. Compare the three roles.
Before you buy
A reusable template pack, not a completed site plan. A competent person confirms the actual work, site, people and controls, keeps a clean master and saves a job-specific copy. It does not guarantee acceptance by any main contractor or prequalification scheme.