Cart
Home/SSSP packs/Concreting/Main Contractor

SITE-MAIN-CC · Concreting

Concreting SSSP pack, Main Contractor

For a main contractor managing site-wide arrangements and other PCBUs.

What is in this pack

Everything below is an editable file, listed exactly as it arrives in the download. The task documents are the full Concreting set, the same ones sold on their own, so buying this pack does not mean buying them again later.

The plan

  • SITE-MAIN-CCSite-Specific Safety Plan, Concreting

The forms

  • SSSP-MC-F01Project Start and Site Setup Checklist
  • SSSP-MC-F03Contractor Pre Start and Shared Controls Agreement
  • SSSP-MC-F04Site Induction and Worker Acknowledgement
  • SSSP-MC-F05Task Plan Review and Work Start Decision
  • SSSP-MC-F06Daily Site Coordination and Pre Start Record
  • SSSP-MC-F07Controlled Work Authorisation and Permit Check
  • SSSP-MC-F08Site Emergency Response Plan and Exercise Record
  • SSSP-MC-F09Site Inspection Checklist
  • SSSP-MC-F10Toolbox and Worker Consultation Record
  • SSSP-MC-F11Plant and Equipment Site Entry Check
  • SSSP-MC-F12Incident Investigation and Action Form
  • SSSP-MC-F13Visitor Briefing and Access Record
  • SSSP-MC-F15Site Access and Traffic Arrangement

The registers

  • SSSP-MC-R01Contractor and Work Plan Review Register
  • SSSP-MC-R02Site Induction Register
  • SSSP-MC-R03Site Attendance and Visitor Register
  • SSSP-MC-R04Competency and Licence Evidence Index
  • SSSP-MC-R05Site Hazard and Shared Control Register
  • SSSP-MC-R06Task Analysis Review Schedule
  • SSSP-MC-R07Site Inspection and Corrective Action Register
  • SSSP-MC-R08Site Incident and Near Miss Register
  • SSSP-MC-R09Hazardous Substances Inventory
  • SSSP-MC-R10Planned Work Notification and Permit Evidence Log

The task documents

  • TA-CC-01Concreting - Master Task Analysis
  • TA-CC-02Site Establishment and Setout
  • TA-CC-03Manual Handling
  • TA-CC-04Material Handling, Loading and Unloading
  • TA-CC-05Truck Operations and Deliveries
  • TA-CC-06Excavation Near Assets
  • TA-CC-07Trench Excavation
  • TA-CC-08Steel Fixing
  • TA-CC-09Formwork - Decks, Columns and Stairs
  • TA-CC-10Concrete Foundations - Excavating and Pouring
  • TA-CC-11Concrete Slab on Ground
  • TA-CC-12Concrete Waffle Pod Raft System
  • TA-CC-13Concrete Piling
  • TA-CC-14Concrete Underpinning
  • TA-CC-15Mobile Concrete Batching
  • TA-CC-16Concrete Pumping (Boom - Line)
  • TA-CC-17Grout Pump
  • TA-CC-18Concrete Placement and Finishing
  • TA-CC-19Shotcrete
  • TA-CC-20Pre-cast - Tilt-up Panels
  • TA-CC-21Tilt-up Panel Lifting
  • TA-CC-22Concrete Kerb and Channel
  • TA-CC-23Concrete Sawing and Core Drilling
  • TA-CC-24Concrete Scanning
  • TA-CC-25Concrete Chasing
  • TA-CC-26Concrete Grinding and Polishing
  • TA-CC-27Decorative Concrete Sealing
  • TA-CC-28Caulking, Grouting and Patching
  • TA-CC-29Concrete Washout Collection
  • TA-CC-30Mobile Concrete Crusher
  • TA-CC-31Hazardous Substances
  • TA-CC-32Working in Private Residences
  • TA-CC-33Silica Dust

The complete Concreting set. Each covers one task with its hazards, controls and a 5 by 5 risk matrix. See every Concreting document.

Which role is this

Main Contractor: For a main contractor managing site-wide arrangements and other PCBUs. Which one you buy follows the position your business holds on site. Choosing one does not by itself satisfy any duty. Compare the three roles.

Before you buy

A reusable template pack, not a completed site plan. A competent person confirms the actual work, site, people and controls, keeps a clean master and saves a job-specific copy. It does not guarantee acceptance by any main contractor or prequalification scheme.