Cart
Home/Trade packs/Electrical

EL · 30 documents

Electrical

Task Analysis templates for electrical work: new installations and renovations, switchboards, cable hauling and containment, low-voltage repairs, temporary connections, test and tag, working near overhead lines, plus the Master Task Analysis for the general activities in its scope.

What is in the pack

All 30 documents below, as editable Word files. Each one is a starting point: you review it against the actual job, delete what is not there, add what is, fill the site fields and brief the crew before it is used.

TA-EL-01 · covers the general activities within its stated scope
Master

Every document in Electrical

Before you buy

These are templates, not a finished safety system, and they require site-specific completion. They are written to the Health and Safety at Work Act 2015 and the General Risk and Workplace Management Regulations 2016. New Zealand does not require a document of this name by law; your main contractor asks for one to evidence the risk-management duty under HSWA s36, and support the worker engagement and participation duties under ss58 to 59.Licence terms · Refund policy